Technical Specifications & Standards

Standard Project Configuration

ParameterSpecification
System Size5 MW
ConfigurationStandalone, front-of-the-meter
InterconnectionCon Edison distribution system
MarketZone J (NYC) or Zone K (Long Island)

Equipment Standards

Battery Systems

  • Tesla Megapack (certified capability)
  • UL 9540A compliant systems

Supporting Infrastructure

  • Medium voltage switchgear
  • Transformers
  • Fire suppression systems
  • HVAC/thermal management
  • Monitoring and controls

Engineering Milestones

MilestoneDescription
Preliminary Engineering30% design package
FDNY FeasibilityCompliance pathway identification
CESIR ApplicationInterconnection study initiation
Detailed EngineeringFull construction drawings
NTP (Notice to Proceed)All permits and approvals secured